{"id":1981,"date":"2020-01-02T09:56:21","date_gmt":"2020-01-02T08:56:21","guid":{"rendered":"https:\/\/blogs.terrassa.cat\/smarterrassa\/?p=1981"},"modified":"2020-01-02T09:56:21","modified_gmt":"2020-01-02T08:56:21","slug":"2020-the-year-of-solar-energy-in-terrassa-buildings","status":"publish","type":"post","link":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/en\/2020\/01\/02\/2020-the-year-of-solar-energy-in-terrassa-buildings\/","title":{"rendered":"2020: the year of solar energy in Terrassa buildings"},"content":{"rendered":"<p>After reviewing <a href=\"https:\/\/blogs.terrassa.cat\/smarterrassa\/?p=1954\">what the TEI project left us throughout 2019<\/a>, it is now time to take a look at what the 2020 project will look like now. TEI continues to roll out: <strong>LED lights will be installed on all streetlights<\/strong> in the coming months &#8211; more than 22,000 have been changed already and another 6,000 are under work &#8211; and <strong>six new hybrid buses will start operating<\/strong>.<\/p>\n<p>What will also come to light in 2020 is the <strong>installation of photovoltaic panels in 13 municipal buildings for energy consumption<\/strong>. At seven of these buildings, works have already been completed: the Ponent, Isaac Peral, Vall\u00e8s and Ramon y Cajal schools, as well as the Alegria theater, the Funeraria de Terrassa (municipal funeral establishment) and the District 4 Library.<\/p>\n<p><a href=\"https:\/\/blogs.terrassa.cat\/smarterrassa\/wp-content\/uploads\/sites\/13\/2020\/01\/solar-energy-2157212_1920-1-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1982\" src=\"https:\/\/blogs.terrassa.cat\/smarterrassa\/wp-content\/uploads\/sites\/13\/2020\/01\/solar-energy-2157212_1920-1-2-1024x564.jpg\" alt=\"\" width=\"1024\" height=\"564\" srcset=\"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-content\/uploads\/sites\/2\/2020\/01\/solar-energy-2157212_1920-1-2-1024x564.jpg 1024w, https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-content\/uploads\/sites\/2\/2020\/01\/solar-energy-2157212_1920-1-2-300x165.jpg 300w, https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-content\/uploads\/sites\/2\/2020\/01\/solar-energy-2157212_1920-1-2-768x423.jpg 768w, https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-content\/uploads\/sites\/2\/2020\/01\/solar-energy-2157212_1920-1-2-1536x846.jpg 1536w, https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-content\/uploads\/sites\/2\/2020\/01\/solar-energy-2157212_1920-1-2.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>Further on, there are two facilities where these panels are already being installed: the <strong>Civic Center of Montserrat, Torre-Sana i Vilardell and the Bisbat d&#8217;\u00c8gara school<\/strong>, specifically in the Primary education building, and <strong>before Easter some more buildings will have the solar panels installed<\/strong>: the municipal sports center of Sant Lloren\u00e7 and the Municipal School of Music.<\/p>\n<p>Initially, the project envisaged the installation of 15 plants, with a projected production of 897,000 kWh\/year, the <strong>electricity consumed by an average of 300 homes over the course of a year<\/strong>. After an in-depth analysis of all the roofs, there will finally be 13 facilities, which will not only be self-sufficient but also will benefit the nearby facilities.<\/p>\n<p>As of now, <strong>about 1,200 PV panels have been installed, out of a total of 1,545<\/strong>, which are expected to be completed and commissioned in March.<\/p>\n<p>This is another step in the pioneering initiative of the TEI project, as part of the Terrassa Smart City strategy, which plans to <strong>save 17 million kWh each year and reduce CO2 emissions by 6,000 tons<\/strong>; all of this, while looking for smart solutions to make Terrassa a greener city and, also, friendlier to its inhabitants.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After reviewing what the TEI project left us throughout 2019, it is now time to take a look at what the 2020 project will look like now. TEI continues to roll out: LED lights will be installed on all streetlights in the coming months &#8211; more than 22,000 have been [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1976,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[684,720],"tags":[85,91,140,144],"class_list":["post-1981","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general-en","category-smart-city-en","tag-ecologism","tag-energy","tag-solar-energy","tag-tei-en"],"_links":{"self":[{"href":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-json\/wp\/v2\/posts\/1981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-json\/wp\/v2\/comments?post=1981"}],"version-history":[{"count":0,"href":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-json\/wp\/v2\/posts\/1981\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-json\/wp\/v2\/media\/1976"}],"wp:attachment":[{"href":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-json\/wp\/v2\/media?parent=1981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-json\/wp\/v2\/categories?post=1981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.terrassa.cat\/ciutatdigital\/wp-json\/wp\/v2\/tags?post=1981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}